Your certification body has just confirmed a Stage 1 date, and someone on the leadership team asks a fair question: what exactly will the auditor ask to see? You have policies, a risk register and a Statement of Applicability. You are less sure you have a dated internal audit, a signed management review or an AI system inventory that matches what engineering shipped last month.
That gap is where most first audits go wrong. ISO 42001 audit preparation means getting a working AI management system, not just a documented one, in front of an accredited certification body: run a readiness assessment, close the gaps, complete an internal audit and a management review, assemble evidence by clause, then pass Stage 1 (documents and readiness) and Stage 2 (operation).
This is the how-to for the audit itself. The control-by-control list lives in our ISO 42001 checklist, fees and the certification path are in the ISO 42001 certification cost guide, and the standard itself is explained in what ISO 42001 is. Here you get a dated plan, an evidence table and a way to close findings.
Here's what I'll cover:
- What an ISO 42001 audit involves and who is allowed to run it
- A week-by-week plan counted back from your Stage 1 date
- The evidence auditors ask to see, clause by clause
- How to run the internal audit and the management review when your team is five people
- What happens in Stage 1 and Stage 2, and how to rehearse both
- How findings are graded and how to close them
What an ISO 42001 Audit Actually Involves Before You Start Preparing
An ISO 42001 certification audit is an independent, accredited body's check that your AI management system (AIMS, the set of policies, roles, risk processes and records that govern how you build and use AI) meets ISO/IEC 42001:2023 and is actually operating. It runs in two stages and then repeats in lighter form every year.
One point shapes everything that follows: the auditor tests the management system, not the model. Nobody is benchmarking your model's accuracy. They sample your records, read your decisions and interview the people who made them.
Three kinds of audit get blurred in most conversations, so it helps to separate them early.
| Audit | Who runs it | What it proves | When |
|---|---|---|---|
| Internal audit | You, or someone you appoint (clause 9.2) | Your AIMS meets your own requirements and the standard | Before the certification audit, then at planned intervals |
| Certification audit (Stage 1 and Stage 2) | An external certification body | The AIMS is designed correctly (Stage 1) and operating (Stage 2) | Once, to earn the certificate |
| Surveillance and recertification audits | The same certification body | The AIMS is still operating between full cycles | Roughly annually, then at the end of the three-year cycle |
The first row is the only one you fully control, which is why it carries so much of the preparation work.
Who Audits You: Certification Bodies and ISO/IEC 42006 in ISO 42001 Audit Preparation
The body that audits you has its own rulebook. ISO/IEC 42006:2025, published in July 2025, sets additional requirements for bodies that audit and certify AI management systems, supplementing the general certification-body standard ISO/IEC 17021-1. In practice that means two questions for any body you are considering: is it accredited to certify against ISO 42001, and how does it apply ISO/IEC 42006 to your scope?
Accreditation programs for AI management systems are still rolling out, so ask for the answer in writing rather than assuming it. Elevate Consult lists UKAS, ANAB, INAB and SANAS among the accreditation bodies to look for, and the same source notes that the certification body and any readiness consultant should be separate organizations for the same scope, which is a sensible impartiality rule to follow.
ISO 42001 Audit Preparation Timeline: Working Back From Stage 1
The easiest way to lose a certification date is to plan forward from "we are mostly ready." Plan backward from Stage 1 instead. The table below is a planning pattern, not a requirement of the standard, and it is my own estimate of how the work sequences for a small team.
| Weeks before Stage 1 | Owner | Output |
|---|---|---|
| 12 to 10 | Compliance lead | Readiness assessment against clauses 4 to 10 and the Annex A controls in your SoA; ranked gap list |
| 10 to 6 | Risk owner, AI system owners | Gaps closed; AI risk assessment and impact assessments complete; Statement of Applicability final |
| 6 to 4 | Internal auditor (independent of the work) | Internal audit performed and report issued |
| 4 to 3 | Top management | Corrective actions logged; management review held, minutes signed |
| 3 to 1 | Compliance lead | Evidence register final; interviewees briefed; logistics confirmed |
| Stage 1 | Whole team | Stage 1 report with any areas of concern |
| Stage 1 to Stage 2 gap | AI owners | Close areas of concern; generate operating records; repeat monitoring |
| 4 to 2 before Stage 2 | Compliance lead | Re-check records, rehearse the sampled-system walkthrough |

Timing the internal audit. ISO/IEC 17021-1 asks the certification body to evaluate, at Stage 1, whether internal audits and management reviews are being planned and performed. The standard text, as quoted in practitioner summaries, does not say a completed cycle must exist before Stage 1, but some certification bodies expect one and CertPro treats the internal audit as a prerequisite for Stage 1. Complete both before Stage 1 if you can, and before Stage 2 at the latest.
ISO 42001 Audit Timeline: Typical Durations at Each Stage
Durations are quoted as typical ranges across certification-body and practitioner guidance, not as fixed rules.
| Stage | Typical duration | What drives it |
|---|---|---|
| Stage 1 | 1 to 2 days | Size of scope; often partly or fully remote |
| Stage 2 | 3 to 9+ days | Headcount, number of AI systems in scope, locations |
| Surveillance audit | About one-third of the initial audit time | Sampling rather than full review |
The certification body sets the actual audit days under ISO/IEC 17021-1 and ISO/IEC 42006, and the calculation method is paywalled, so treat its written quote as the authoritative figure. For the same ranges alongside fees, see our certification cost breakdown.

ISO 42001 Audit Preparation Step by Step: From Scope to a Working AIMS
Five steps carry a team from "we have documents" to "we have a system an auditor can test." The first three are below. Evidence, the internal audit and the management review get their own sections because that is where most of the work and most of the findings sit.
Step 1: Freeze the Scope and AI Inventory First in Your ISO 42001 Audit Preparation
Scope (clause 4.3) and the AI system inventory drive everything an auditor samples. Glocert, a certification body, lists an incomplete AI system inventory as the first of its common nonconformities, tied to clauses 4.3 and 8.1.
Build the inventory as one row per AI system or feature:
- Owner: one named person, not a team
- Purpose: what the system decides or produces, and for whom
- Data: what it is trained on or fed, including customer data
- Source: built in-house, or a third-party model or API
- Risk tier: how you ranked it and why
Include the AI features you buy and ship, not only models you train. A vendor model embedded in your product is in scope for the questions that matter.
Scope should be narrow and honest rather than broad and thin. An AIMS scoped to the product line customers ask about is fine. A scope that quietly leaves out the AI feature named in your own security questionnaire is the trap, because the auditor reads both documents.
Step 2: Run an ISO 42001 Readiness Assessment Against Clauses 4 to 10 and Annex A
A readiness assessment is an optional review of your AIMS against the standard before the certification body arrives. It is the cheapest place to find gaps. Run it yourself or with a separate readiness partner, never with the body you plan to certify with.
The output is a gap list with an owner, a due date and a severity for each item, organized by clause area:
| Clause area | What to confirm | Typical gap |
|---|---|---|
| 4. Context and scope | Scope statement, interested parties, role in the AI ecosystem | Scope omits shipped AI features |
| 5. Leadership | Approved AI policy, assigned roles | Policy lacks responsible-AI commitments |
| 6. Planning | AI risk assessment, impact assessments, SoA, objectives | Generic risk assessment that names no real system |
| 7. Support | Competence, awareness, documented information | No training or competence records |
| 8. Operation | Lifecycle processes, third-party AI controls | Vendor models not governed |
| 9. Performance evaluation | Monitoring, internal audit, management review | No management review minutes |
| 10. Improvement | Nonconformity and corrective action process | Findings logged but never closed |
Use the ISO 42001 checklist as the reference for the 38 Annex A controls rather than rebuilding that list here.
Step 3: Close Gaps and Finalize the Statement of Applicability for ISO 42001 Audit Preparation
Gap closure is mostly about records that look like the standard asks for them. Glocert's most common findings, by clause, are a good guide to where to spend effort: a generic AI risk assessment (6.1.2), missing impact assessments (6.1.4 and 8.4), Statement of Applicability gaps (6.1.3), an AI policy without responsible-AI commitments (5.2) and missing competence evidence (7.2).
A passing version of each is easy to describe:
- Risk assessment: names the actual AI systems and the harms you considered for each
- Impact assessment: one per in-scope system, dated, with an approver
- Statement of Applicability: every control marked applicable or not, with a justification for each exclusion
- AI policy: approved by top management and communicated, with explicit commitments
- Competence evidence: training and role records tied to named people
You do not need to implement all 38 Annex A controls. The Statement of Applicability records which apply and why, and an auditor will test that the reasoning holds up.
ISO 42001 Audit Evidence: What Auditors Ask to See, by Clause
Auditors do not read evidence as a pile. They follow a thread from a requirement to a record and check that the record is dated, owned and produced by the running system. This table is the thread, clause by clause. Clause numbers follow ISO/IEC 42001:2023 as described in standards listings and practitioner summaries.
| What the auditor asks | Record that proves it | Clause | Typical owner |
|---|---|---|---|
| What is in scope? | Scope statement and AI system inventory | 4.3, 8.1 | Compliance lead |
| Who is accountable? | Approved AI policy; roles and responsibilities | 5.2, 5.3 | Top management |
| How do you decide which risks matter? | AI risk assessment and treatment plan | 6.1.2, 6.1.3 | Risk owner |
| What could your systems do to people? | AI system impact assessments | 6.1.4, 8.4 | AI system owners |
| Which controls apply, and why not the rest? | Statement of Applicability | 6.1.3 | Compliance lead |
| What are you trying to achieve? | AI objectives and progress | 6.2 | Top management |
| Are people competent? | Training and competence records | 7.2, 7.3 | HR or compliance lead |
| Show me one system's lifecycle | Design, data, testing, deployment and monitoring records | 8.1, Annex A lifecycle objective | AI system owner |
| How do you govern vendor models? | Supplier reviews and third-party AI controls | 8.1, Annex A third-party objective | Security or procurement |
| Did you check yourself? | Internal audit programme and report | 9.2 | Internal auditor |
| Did management look? | Management review minutes | 9.3 | Top management |
| What happened to the problems? | Corrective action log | 10.2 | Compliance lead |
Four quality rules apply to every row:
- Dated and versioned. An undated policy is a draft.
- Approved by a named person. "The leadership team" is not a signature.
- Produced by the system running. Records written the week before the audit read as exactly that.
- Findable in under a minute. Keep one evidence register with clause, record, location, owner and last-updated date, in a tool the team already uses.
Evidence shows the management system runs. It does not show that a given model is safe, and no auditor will say otherwise.
ISO 42001 Audit Preparation Checklist: The Final Two Weeks Before Each Stage
This is the ISO 42001 audit checklist a team works from in the last two weeks before each stage. Treat each line as a yes or no, and close the "no" answers before the date, not at the opening meeting.
Before Stage 1:
- ☐ Scope statement and AI policy approved and dated
- ☐ AI risk assessment and treatment plan current for every in-scope system
- ☐ Impact assessments complete for in-scope AI systems
- ☐ Statement of Applicability final, with a justification for each exclusion
- ☐ Internal audit performed, report issued to management
- ☐ Management review held, minutes signed by top management
- ☐ Corrective actions logged with owners and due dates
- ☐ Evidence register current and shared with the audit lead
- ☐ Remote or on-site logistics and attendees confirmed
Before Stage 2:
- ☐ Every Stage 1 area of concern closed, or in progress with evidence
- ☐ Operating records exist since Stage 1: monitoring, incident log, change approvals
- ☐ The highest-risk AI system walked through end to end by the team once
- ☐ Interviewees briefed on the policy, their role and how to raise an AI concern
- ☐ Corrective actions from the internal audit closed or verified
- ☐ Evidence register updated for changes since Stage 1
- ☐ Any new AI system or material change since Stage 1 added to the inventory and assessed
ISO 42001 Internal Audit: How to Run One That Satisfies Clause 9.2
Is an internal audit required for ISO 42001? Yes. Clause 9.2 requires you to audit the AIMS at planned intervals to confirm it conforms to your own requirements and the standard, and that it is effectively implemented. Practitioner summaries describe the expectation as an audit programme with defined criteria and scope, objective and impartial auditors, reporting to management and retained records.
An external auditor reads three things first: the programme, the report, and the proof that findings reached management and were tracked. Glocert lists internal audit deficiencies as a common nonconformity under 9.2, so this is not a formality.
Who Can Run the Internal Audit When You Have Five People
The rule is simple: nobody audits their own work. With a small team there are three honest options.
| Option | Independence | Depth | Cost |
|---|---|---|---|
| Peer from another function (engineering audits compliance records; compliance audits engineering) | Good if the peer owns none of the audited area | Depends on training | Internal time only |
| External consultant or audit partner | Strongest | Strongest, if they know AI systems | Paid engagement |
| Split programme, each person audits areas they do not own | Good if split cleanly | Uneven | Internal time only |
Audit the whole AIMS across the programme cycle, not every control every time. Start with the highest-risk AI systems and the clauses certification bodies cite most.
If you already run ISO 27001 internal audits, the programme structure carries over, and our ISO 27001 internal audit guide covers it. The AI-specific parts, impact assessments and lifecycle records, still need to be added.
What the Internal Audit Report Needs to Say
A report an external auditor trusts has these parts:
- Scope and criteria: which clauses, systems and period
- Method and sample: what was reviewed, how it was chosen
- Findings: graded the way the certification body will grade them (conformity, observation, minor, major)
- Root causes where known
- Owners and due dates for each action
- Sign-off and distribution to top management
A report with zero findings is a red flag to an external auditor, not a pass. First audits find things. Showing that you found them first is the point.
ISO 42001 Management Review: Running Clause 9.3 Before the Auditor Asks
Glocert lists "no evidence of management review" under clause 9.3 among the common nonconformities, and it is one of the easiest to avoid.
Top management reviews the AIMS at planned intervals to confirm it remains suitable, adequate and effective. Clause 9.3 has three parts, general (9.3.1), inputs (9.3.2) and results (9.3.3), and the inputs include the status of actions from previous reviews. The standard defines the full input list, so check it against your copy of ISO/IEC 42001 before you finalize an agenda.
A 60-minute agenda a small team can run covers the substance the review is meant to judge:
- Results of the internal audit and any external findings
- AI incidents and near misses since the last review
- Status of corrective actions
- Changes to scope, AI systems or interested-party expectations
- Changes to risk and impact assessments
- Progress against AI objectives
- Opportunities for improvement
- Decisions, owners and dates
The evidence is the minutes. Dated, with attendees listed by name including top management, and with decisions assigned to owners. A calendar invite is not evidence.
Hold the review after the internal audit so its results are an input, and before Stage 1 if you can.
ISO 42001 Stage 1 Audit: What the Auditor Checks and the Three Possible Outcomes
Stage 1 is a documentation and readiness review, typically 1 to 2 days and often remote. The auditor checks that the scope, AI policy, risk assessment method, impact assessments, Statement of Applicability, internal audit records and management review records exist and are fit to be tested at Stage 2.
| Question | Stage 1 answer |
|---|---|
| What is reviewed? | Documented AIMS and readiness, not operating effectiveness |
| Who do you meet? | AIMS owners, plus the people who ran the internal audit and review |
| What comes out? | A report with areas of concern that become nonconformities if left unresolved |
The Cloud Security Alliance describes the output as a closing meeting and formal report. Practitioner sources describe three outcomes: proceed to Stage 2, proceed with concerns to fix, or delay Stage 2 until major gaps are closed. Your certification body's own report is the authority on which one you get.
What to have in the room: the owner of scope and policy, the risk owner, whoever ran the internal audit, and the evidence register open on screen. Stage 1 is the cheapest place to learn what the body thinks is missing. Treat it as a rehearsal with consequences, not an exam.
ISO 42001 Stage 2 Audit: Interviews, Sampling and What Gets Tested
Stage 2 tests whether the AIMS is operating. The auditor interviews staff, observes processes, samples records and AI systems, and tests controls against clauses 4 to 10 and the Annex A controls in your Statement of Applicability. It typically takes 3 to 9+ days, and sampling is weighted toward higher-risk AI systems.
How a Sampled-System Walkthrough Goes
Expect the auditor to pick one system from your inventory and follow it end to end. You can rehearse the same trace:
- Start at the inventory: show the system, its owner and its risk tier
- Show the assessments: the risk assessment and the dated impact assessment
- Show lifecycle records: design, data, testing, deployment and monitoring
- Show oversight: how a human can intervene and how an incident is raised
- Show a change: one change that went through approval, with the record
- Show the supplier: the review of any third-party model it depends on
Run this on your highest-risk system twice before Stage 2. The second run is when the real gaps appear.

Interview Preparation
Auditors interview top management, the AI owner, engineers and whoever handles incidents. Each person should be able to say, in their own words, what the AI policy commits to, what their role is and how they raise an AI concern.
Answer what was asked, show the record, and never invent a process. An auditor who hears a confident description of a process that does not exist will find it in the next hour.
What Stage 2 Tests That Stage 1 Did Not
- Management review in real operation, not as a template
- Internal audit follow-up and closure of its findings
- Corrective actions that were closed and verified
- Monitoring and incident records accumulated over time
After the audit comes a closing meeting and a report. The certification decision is made by the certification body, and the exact decision steps are specific to each body, so ask yours how it works before the audit begins.
Common ISO 42001 Audit Preparation Mistakes That Produce Nonconformities
Glocert, a certification body, publishes the findings it sees most often. They map cleanly to clauses, which makes them a useful list to check your own AIMS against.
| Common finding | Clause | Fix |
|---|---|---|
| Incomplete AI system inventory | 4.3, 8.1 | One row per AI system, including vendor models |
| Generic AI risk assessment | 6.1.2 | Name the systems and the harms considered |
| Missing impact assessments | 6.1.4, 8.4 | One dated assessment per in-scope system |
| AI policy lacks responsible-AI commitments | 5.2 | Add explicit commitments and approval |
| Insufficient competence evidence | 7.2 | Training and role records by name |
| Statement of Applicability gaps | 6.1.3 | Justify every exclusion |
| No evidence of management review | 9.3 | Dated, signed minutes |
| Internal audit deficiencies | 9.2 | Programme, independence, report |
| Third-party AI not governed | 8.1, Annex A | Supplier review for each external model |
| Nonconformity process not followed | 10.2 | Log, cause, fix, verify |
Behind those findings sit five preparation mistakes, and they are worth naming because they are about sequencing, not knowledge.
- Building the AIMS and the evidence at the same time. Records created the week before the audit look it.
- Scoping to IT instead of to AI use. The auditor follows AI systems, not your network diagram.
- Treating the internal audit as a formality. A thin audit fails the clause it was meant to prove.
- Booking Stage 2 before the system has operating history. A two-week-old AIMS has little for an auditor to sample.
- Forgetting the AI you buy. Vendor models and embedded AI features are part of the picture.
ISO 42001 Nonconformities: Major, Minor and Observations Explained
Certification bodies grade findings by how far they affect the system. Glocert defines the two main grades:
- Major nonconformity: the absence or complete failure to implement a required element, or significant doubt that the AIMS is effective. It must be resolved before certification can be granted.
- Minor nonconformity: an isolated lapse that does not indicate a systemic failure. Certification can still be granted, with a corrective action plan and evidence of closure.
- Observation or opportunity for improvement: advisory, with no required action.
What happens if you fail an ISO 42001 audit? You do not fail in the pass-mark sense. A major nonconformity holds the certificate until it is closed, and the certification body sets the deadline and decides whether a follow-up visit is needed. Published remediation windows vary between sources, so ask your body for its deadline rather than planning around a generic number.
ISO 42001 Audit Preparation for Findings: Root Cause, Fix and Verification
Clause 10.2 asks for a sequence: react to the nonconformity and contain it, evaluate whether action is needed to remove the cause, implement the action, and review its effectiveness. Presencis describes this sequence in its clause summary.

Keep the response proportionate, verify that it worked, and keep the record. The next auditor reads it.
After the Audit: Certificate, ISO 42001 Surveillance Audits and Recertification
The certificate is valid for three years. Sources describe annual surveillance audits in the years between and a recertification audit before expiry, though they differ slightly on where the first surveillance falls. Read your certification body's schedule rather than assuming.
An ISO 42001 surveillance audit runs about one-third of the initial audit time and samples rather than re-reviewing everything, according to the Cloud Security Alliance. Its job is to confirm the AIMS is still operating, not to relitigate every control.
What keeps the next audit easy:
- The internal audit programme: keep to the cycle you committed to
- Management review cadence: hold it on schedule, not when the auditor emails
- The corrective action log: close items and verify them
- Inventory updates: add each new AI system when it ships
- Impact assessments: refresh them when a system changes materially
Tell your certification body early about a material change to scope or AI systems, which is general practice and worth confirming in your contract.
Where ComplyJet Fits Into Your ISO 42001 Audit Preparation
We support ISO 42001 from initial scoping to the day your report is signed. The platform connects to your AI systems, cloud infrastructure and identity tools across 350+ integrations, keeps evidence timestamped and stored, and gives your auditor a workspace to access directly, so the evidence register described above builds as you work rather than the week before the audit.
The rest of the preparation in this guide is where a team helps most. We provide AIMS policy templates, an AI risk assessment workflow, AI impact assessment templates, AI supply chain tracking for model providers and datasets, automated AI governance training with acknowledgement tracking, and proactive gap reviews that flag problems before the auditor does. Our vetted auditor network includes independent ISO 42001 auditors.
Pricing is a flat fee per company, not per seat, for companies up to 50 employees, so adding people to the audit does not change the cost. Certification audit fees are separate and paid to the certification body.
FAQs
How Do I Prepare for an ISO 42001 Audit?
Start with scope and an AI system inventory, run a readiness assessment against clauses 4 to 10, close the gaps, complete an internal audit and a management review, and assemble an evidence register by clause. Then rehearse the Stage 1 meeting and a sampled-system walkthrough for Stage 2. The timeline table above gives a week-by-week order.
What Happens in an ISO 42001 Stage 1 Audit?
Stage 1 is a documentation and readiness review, typically 1 to 2 days. The auditor checks scope, AI policy, risk assessment method, impact assessments, the Statement of Applicability and internal audit and management review records. It ends with a report listing any areas of concern.
What Happens in an ISO 42001 Stage 2 Audit?
Stage 2 tests whether the AIMS is operating. The auditor interviews staff, observes processes and samples records and AI systems, with more attention on higher-risk systems. It typically takes 3 to 9+ days and ends with a closing meeting, a report and a certification decision by the certification body.
Is an Internal Audit Required for ISO 42001?
Yes. Clause 9.2 requires internal audits at planned intervals, and the certification body checks that they are planned and performed. Complete one before Stage 1 if you can, and before Stage 2 at the latest, with an auditor who did not do the work being audited.
How Long Does an ISO 42001 Audit Take?
Stage 1 typically takes 1 to 2 days and Stage 2 typically takes 3 to 9+ days, with a gap of 4 to 12 weeks between them. Your certification body sets the actual audit days for your scope. Preparation before Stage 1 is often a few months of work for a small team, in my estimate, depending on the starting point.
What Evidence Do Auditors Ask for in an ISO 42001 Audit?
They ask for records tied to clauses: scope and AI inventory, AI policy, risk and impact assessments, the Statement of Applicability, competence records, lifecycle records for sampled systems, supplier reviews, the internal audit report, management review minutes and the corrective action log. Each should be dated, owned and produced by the running system.
What Is a Major Nonconformity in ISO 42001?
A major nonconformity is the absence or complete failure to implement a required element, or significant doubt that the AIMS is effective. It must be resolved before certification is granted. A minor nonconformity is an isolated lapse that can be closed through a corrective action plan.
What Happens If You Fail an ISO 42001 Audit?
A major nonconformity holds the certificate until it is closed, and the certification body decides the deadline and any follow-up visit. Minor nonconformities need a corrective action plan with evidence of closure. Ask your body for its closure deadline before the audit.
How Often Are ISO 42001 Surveillance Audits?
Roughly annually during the three-year certificate cycle, then a recertification audit before expiry. A surveillance audit takes about one-third of the initial audit time and uses sampling. Check your certification body's schedule for the exact dates.
Related Reading
- What Is ISO 42001? The Complete AI Management System Guide, for the standard itself explained
- ISO 42001 Checklist: All 38 Annex A Controls Explained, for the controls and mandatory documents
- ISO 42001 Certification Cost: Requirements, Process & Timeline, for fees and the certification path
- ISO 42001 vs ISO 27001, for what carries over if you already hold ISO 27001
- ISO 27001 Internal Audit, for an internal audit programme you can adapt
- SOC 2 Audit Process, for how a comparable audit runs
- ComplyJet's ISO 42001 Framework Page, for certification support
Sources: ISO/IEC 42006:2025; Cloud Security Alliance, What to Expect in the ISO 42001 Certification Process; Glocert, Common ISO 42001 Nonconformities; CertPro, ISO 42001 Audit; Elevate Consult, ISO 42001 Certification Review; RSI Security, Preparing for Your ISO 42001 Audit; Presencis, ISO 42001 clause 10.2. Clause numbering was checked against standards-store listings and practitioner summaries because the standard text is paywalled.





